Maderas
El Real S.L. began its work within the sector of first wood transformation
in 1985, although
up until this year we had continually been investing in new types of
technology. At present, our production lines are completely automated,
and our 18 employees work in two shifts. We use modern equipment that
enables us to produce efficiently and accurately.
With
a surface area of 55,000 m2,
of which 2,000 m2 are covered, Maderas El Real is located in
the town of Sarrión
(Teruel), on the N-234 road that joins Teruel with Valencia. Such
a privileged location guarantees our pine wood supplies. Due to its
special physical-mechanical characteristics, this type of wood gives
the end product numerous advantages. We have a drying out plant measuring
50,000 m2, which takes advantage of our climate (generally cold and
dry), and which guarantees the slow natural drying out of the wood to
achieve greater stability.Furthermore, Maderas El Real
hastwo artificial driers that are supplied with heat from Real
Energética S.L. , a co-generation company.
The
main varieties of pine we work
with at the sawmill are cluster, insignis, scots and maritime, and
our annual consumption of pine wood is approximately 24,000 m3. We are
constantly committed to the environment, and we promote the management
of sustained forests by only buying raw materials from controlled plantations,
where the use of the forests respects nature.
Company
photo gallery